Client: Crown Packaging
Location: Wantage, Oxfordshire, UK
System Installed: Meta “Extreme” 358 Anti-Climb Mesh, Pro-V Mesh System (Around Pond Area), Security & Access Gates (Matching System Design)
Sector: Commercial & Industrial
Project Overview
Crown Packaging approached Metafence to carry out a full upgrade of their perimeter security. Their existing chain-link fencing no longer met the modern security requirements for an industrial facility. The goal was to install a high-security anti-climb mesh fence around the site’s boundary, along with additional safety fencing near a pond. Due to operational constraints and budget planning, the project was phased over time to suit the client’s needs.
Why Crown Packaging Chose Metafence
Metafence was selected for our ability to deliver phased fencing upgrades, ensuring daily site security wasn’t compromised during works. Our team proposed the Metafence “Extreme” 358 mesh system, a robust, anti-climb perimeter solution ideal for high-risk industrial sites. Additionally, the Pro-V Mesh was chosen for internal zones, including safety fencing around a pond used by staff and visitors.
The client trusted our knowledge in industrial fencing installation, particularly for sites with ongoing operations, uneven terrain, and safety-critical requirements.
Work Completed
- Dismantled and removed existing 2.4m high chain-link fencing
- Cleared overgrowth and shrubbery along the fence line
- Installed 2.4m high Metafence “Extreme” 358 mesh for site perimeter
- Installed Pro-V Mesh fencing system to enclose pond for health & safety compliance
- Supplied and fitted multiple access gates to match the installed systems
- Managed the works in phased sections, maintaining site security at all times
Challenges & Solutions
- Soft Ground Conditions: In several areas, post depths were increased and concrete foundations enlarged to maintain a solid and level fence line
- Sloped Terrain: Where fencing crossed inclines, trenching was used to eliminate ground gaps and preserve security integrity
- Phased Working: Each fencing section was dismantled and replaced daily, ensuring the site was never left unsecured overnight
Results & Benefits
- Enhanced Perimeter Security: The 358 mesh provides superior anti-climb performance over outdated chain-link
- Improved Aesthetic: A clean, modern fence line gives the site a more professional appearance
- Safety Compliance: The Pro-V mesh safely separates public and staff from hazardous pond areas
- Future-Proofed Installation: Durable mesh and concrete foundations ensure long-term performance
- Client Flexibility: Project phasing allowed Crown Packaging to align works with their budget and operational timeline